Estimate updated by Danny McGlashing.
Hammerworks Co. agrees to furnish all labor for the complete remodel;
removal/demolition and installation of the following in the second floor
common area bathroom:
Demolition: and
removal of all existing elements in the bathroom including: the floor
and subfloor, the vanity/countertop/sink faucet and all hardware/plumbing. The existing bath and shower liner, the valves/tub-cock/showerhead/overflow and spindle. The toilet, wax ring, shutoff valve and flex lines. 4″ of the partition wall that juts out into the footpath of the bathroom. Any drywall that may be behind the shower liner. The
medicine cabinet and all accessories. The lighting and bath fan.
Installation: Of a new porcelain floor and subfloor, grout and sealer. A new bathtub and hardware. New tiled shower walls creating a better look and more bathing space. New recessed lighting added as well as a new bath fan and lighting over the new built in medicine cabinet. New toilet, toilet hardware and plumbing. New single unit vanity/sink combo. New plumbing underneath and faucet. All new accessories ie. toilet hardware, toilet paper holder, hooks, shower curtain rod and bath towel holders and fresh paint throughout.