Estimate updated by Danny McGlashing.
Hammerworks Co. agrees to furnish all labor for the complete remodel;
removal/demolition and installation of the following in the second floor Master Bathroom:
Demolition: and
removal of all existing elements in the bathroom including: the floor
and subfloor. The existing shower, hardware and entire partition wall. The toilet, and all hardware/plumbing. Any drywall that may be behind the shower liner. All accessories, mirror, cabinets, the vanity and countertops, sink, faucets, plumbing and lighting.
Installation: Of a new porcelain floor and subfloor. A frameless glass door and sidewall
where the partition wall used to be (This will open up the bathroom space and make it a very bright and open non-cavernous feeling space). All new porcelain tile and hardware in the shower, including the floor. A new designer double-sink vanity and designer faucets. Custom built mirrors and custom lighting over them both. New recessed lighting added as well as a new bath fan and lighting over the new toilet. Dimmers on the lights. New trim/chair rail and 2 tone paint. Wainscotting is an option under the rail. New Plumbing throughout and all new designer accessories ie. toilet hardware, toilet paper holder, hooks, shower curtain rod and bath towel holders and fresh paint throughout.