Estimate updated by Danny McGlashing.
Hammerworks Co. agrees to provide all labor and materials for the removal of and installation of all new padding and berber carpeting in the following areas (totaling 175 sq. yards):
1. The rear room in the basement.
2. The staircase between the basement and first floor.
3. The staircase and center landing between the first and second floor.
4. The hallway and closet(s).
5. The master bedroom and all closets.
6. The 2 second floor bedrooms and their closets.